Zanzibar Launches 20 MWp Solar Project

Key Figures & Findings: AG EnergiSes Co. Ltd of Tanzania has signed a contract to begin construction of a 20 MWp solar photovoltaic plant in Zanzibar, marking a major step in the island’s clean energy transition. The project, equipped with a tracking system, will supply power to the Zanzibar Electricity Corporation (ZECO) under a long-term arrangement. AG Energies will also serve as the EPC contractor, reinforcing its role as an independent developer in East Africa’s renewable sector.

Statistics & Insights: The plant will diversify Zanzibar’s energy mix and reduce reliance on imported fossil fuels, though key figures such as the financing structure, capital providers, and commissioning timeline remain undisclosed. Once completed, the facility is expected to make a measurable contribution to energy stability and reduce fuel import costs.

Future Implications: If executed as planned, the Zanzibar solar plant could strengthen the island’s energy independence, lower fossil fuel imports, and provide a model for small-island economies seeking to integrate utility-scale renewables.

Quick Take: Zanzibar to host its first 20 MW solar plant, advancing the island’s renewable energy transition and reducing fossil fuel dependence.